Here are the major scheduled road and lane closures for Monterey County from Sunday, May 3 through Sunday, May 10, 2015 – newest information is in red. Please keep in mind that construction work is weather-dependent.

Highway 1 – Big Sur: May 4 – May 8
  • Daytime crack seal work along Highway 1 between Anderson Canyon Bridge and Grimes Canyon from 8 a.m. to 4 p.m.
  • Motorists can expect delays of approximately 5 minutes
PG&E Gas Line Replacement Project – Highway 68: May 3 – May 9
  • Gas line replacement work will result in night time lane closures along eastbound and westbound Highway 68 between Olmsted Road and San Benancio Road from 8 p.m. to 5 a.m.
  • Motorists can expect delays of approximately 15 minutes
Highway 101 – Greenfield: May 3 – May 8
  • Daytime and night time pavement work along northbound and southbound Highway 101 at Espinosa Road.
  • Motorists should expect delays of approximately 10 minutes.
Highway 101 – Spence Road and Abbott Street Ramps: May 5
  • Daytime drainage work will result in the temporary closure of the Spence Road and Abbott Street ramps along northbound Highway 101 from 9 a.m. to 2 p.m.
  • Motorists should expect delays of approximately 20 minutes.
Highway 101 – San Juan Road Interchange Project: May 3 – May 8
  • Night time paving along southbound and northbound Highway 101 between Dunbarton Road (South) and Cannon Road/Rocks Road from 7:30 p.m. and 5:30 a.m.
  • The southbound San Juan Road exit will be subject to closure from 7:30 p.m. and 5:30 a.m.
    • Motorists should detour to Crazy Horse Canyon Road.
  • Motorists should expect delays of approximately 10 minutes.
Highway 156 –Castroville to Prunedale: May 4 – May 7
  • Daytime pavement work will result in lane closures along eastbound and westbound Highway 156 between Oak Hills Drive and the pedestrian overcrossing in Castroville from 9 a.m. to 2 p.m.
  • There will be one-way reversing traffic control with flaggers.
  • Motorists should expect delays of approximately 15 minutes.
South Salinas: Westbound Blanco Road Closure
  • Industrial wastewater pipe installation will result in the closure of westbound Blanco Road between Blanco Circle and La Mesa Way starting Monday, May 4.
  • Eastbound Blanco Road will be subject to daytime lane closures from 7 a.m. to 4 p.m.
  • Detour signs will be in place to help direct motorists.
  • Motorists should expect delays of approximately 15 minutes.