Here
are the major scheduled road and
lane closures for Monterey County from Friday,
November 16 through Sunday, November 23, 2014 – newest information is in red. Please keep in mind that construction work is
weather-dependent.
Highway 1 – Big Sur: November 17 –
November 21
- Daytime drainage work along Highway 1 at two locations from 8:30 a.m. to 3 p.m.
- The locations are:
- Buck Creek Bridge to Anderson Canyon Bridge
- Little Sur River Bridge to Garrapata Creek Bridge
- Motorists can expect delays of approximately 10 minutes
Highway 1 – Monterey: November 16 – November
17
- Night time k-rail installation on the northbound Fremont Street Highway 1 on-ramp between from 8 p.m. to 6 a.m.
- Motorists can expect delays of approximately 10 minutes
Highway 68 – Multiple Locations: November 16
– November 22
- Night time utility work along eastbound and westbound Highway 68 at multiple locations from 8 p.m. to 5 a.m.
- Locations are:
- Blue Larkspur Lane to Bit Road.
- Corral De Tierra Road to Laureles Grade.
- Quail Ridge Lane to Corral De Tierra Road.
- San Benancio Road to Torero Drive.
- Motorists can expect delays of approximately 10 minutes
Highway 101 – Bradley: November 20
- Daytime bridge work on northbound Highway 101 at Jolon Road in Bradley from 9 a.m. to 3:30 p.m.
- Motorists can expect delays of approximately 10 minutes
Highway 101 – King City: November
19
- Daytime survey work on Highway 101 at Jolon Road in King City from 8:30 a.m. to 3:30 p.m.
- Motorists can expect delays of approximately 10 minutes
Highway 101 – Soledad: November 18
- Daytime bridge work on northbound Highway 101 between Arroy Seco Road and Route 146 from 9 a.m. to 3 p.m.
- Motorists can expect delays of approximately 10 minutes
Highway 101 – Salinas: November 19 –
November 21
- Daytime pavement repair on Highway 101 between Route 68 (John Street) and Route 183 (North Main Street) from 9 a.m. to 2 p.m.
- Motorists can expect delays of approximately 10 minutes
Highway 101 – Prunedale Improvement Project: November
16 – November 21
- Night work will result in alternating lane closures on northbound and southbound Highway 101 at the following locations from 7:30 p.m. and 6 a.m.
- The locations are:
- Between Boronda Road and Ralph Lane.
- Between Vierra Canyon Road and Tustin Road.
- Between Mallory Canyon Road and Echo Valley Road.
- The Crazy Horse Canyon Interchange northbound and southbound on-ramps and off-ramps.
- Motorists should expect delays of approximately 10 minutes.
Davis Road Closure: November 14 – November 24
- Davis Road is temporarily closed to through traffic between Hitchcock Road and Reservation Road.
- Motorists should follow the posted detour.
Imjin Parkway Class II Bike Lane Project
- Daytime bike lane work on Imjin Parkway between Reservation Road and Imjin Road may result in alternating lane closures from 9 a.m. to 4 p.m.
- Motorists can expect delays of approximately 10 minutes
No comments:
Post a Comment