PIP Map

Friday, May 16, 2014

ROAD AND LANE CLOSURES FOR MAY 18 - MAY 25



Here are the major scheduled road and lane closures for Monterey County from Sunday, May 18, through Sunday, May 25, 2014 – newest information is in red. Please keep in mind that construction work is weather-dependent.

Highway 1 – Big Sur Coast: May 19 – May 23
  • Daytime drainage work and vegetation spraying along Highway 1 between Lime Creek Bridge and Garrapata Creek Bridge from 9 a.m. to 3:15 p.m.
  • Motorists can expect delays of approximately 10 minutes.
Highway 1 – Carmel: May 19
  • Daytime tree removal on southbound Highway 1 will close the right hand turn pocket at Ocean Avenue from 9 a.m. to 3 p.m.
  • Caltrans will be controlling traffic.
  • Motorists can expect delays of approximately 10 minutes
Highway 1 – Seaside: May 21 – 22
  • Daytime pavement repair will result in lane closures on the Highway 1 / Fremont Street interchange from 9 a.m. to 3 p.m.
  • The closures are:
    • Northbound on-ramp #2 (slow) lane Wednesday, May 21.
    • Southbound off-ramp, all lanes, Thursday, May 22.
  • Motorists can expect delays of approximately 15 minutes
  • THERE WILL BE ELECTRONIC MESSAGE BOARDS ALERTING MOTORISTS AND THE CHP WILL ASSIST WITH TRAFFIC CONTROL (TUESDAY THROUGH THURSDAY).
Highway 1 – Moss Landing: May 19
  • Daytime pavement repair will result in the closure of northbound Highway 1 near Struve Road from 9 a.m. to 3 p.m.
  • One-way traffic control will be in effect.
  • Motorists can expect delays of approximately 40 minutes
  • MOTORISTS ARE STRONGLY ADVISED TO AVOID THE ABOVE LOCATION IN MOSS LANDING DURING THIS CLOSURE
  
Highway 68 – Monterey: May 19 – May 23
  • Night time utility work on Highway 68 between Josselyn Canyon Road and Torero Drive from 8 p.m. to 5 a.m.
  • Motorists can expect delays of approximately 5 minutes.
Highway 68 – Salinas: May 19
  • Daytime utility work on eastbound Highway 68 (south Main Street) between San Joaquin Street and San Miguel Avenue from 8 a.m. to 1 p.m.
  •  Motorists can expect delays of approximately 10 minutes
Highway 101 – King City and Greenfield: May 19 – 23
  • Daytime tree removal along southbound Highway 101 between Lagomarsino Avenue and Central Avenue from 8 a.m. and 3:30 p.m.
  • Motorists can expect delays of approximately 10 minutes.
Highway 101 – Prunedale Improvement Project: May 19 – May 24
  • Night time construction on Highway 101 will result in temporary closures of Highway 101 at the Crazy Horse Canyon Road Overpass and the Crazy Horse Canyon / northbound Highway 101 on-ramp between the hours of 8:30 p.m. and 5:30 a.m.  
  • The closures are:
    • Monday, May 19: Crazy Horse Canyon / northbound Highway 101 on-ramp.
    • Tuesday, May 20: Crazy Horse Canyon / northbound Highway 101 on-ramp
    • Wednesday, May 21: Southbound Highway 101: southbound traffic to use interchange ramps.
    • Thursday, May 22: possible closures. Update next week.
  • Drivers traveling from Crazy Horse Canyon Road to northbound Highway 101 should detour to San Miguel Canyon Road on the nights of Monday, May 19 and Tuesday, May 20.
  • Flaggers will be in place to control traffic and allow drivers to access Crazy Horse Canyon Road and Echo Valley Road during the highway closures.  
  • The lane closures are necessary to allow crews to install new drainage for the highway.
  • Motorists should expect delays and plan for extra travel time.