PIP Map

Friday, April 11, 2014

ROAD AND LANE CLOSURES FOR Apr 13 - APR 20



Highway 1 – Multiple Locations:  Apr. 14 – Apr. 18
  • Daytime drainage, crack and seal, and maintenance work at two locations along Highway 1 between from 7 a.m. to 3:30 p.m.
  • Locations are:
    • Rain Rock to Lime Creek Bridge: Crack Seal Operation
    • Big Creek Bridge: Maintenance Operation
    • Lime Creek Bridge to Garrapata Creek Bridge: Drainage work and vegetation spraying.
  • Motorists can expect delays of approximately 10 minutes.
Highway 1 – Carmel:  Apr. 13 – Apr. 14
  • Nighttime pavement work on southbound Highway 1 between Third Avenue and Ocean Avenue from 8 p.m. to 5 a.m.
  • Motorists can expect delays of approximately 10 minutes.
Highway 1 and 68 – Monterey to Aptos:  Apr. 14 – Apr. 18
  • Night time striping work on 10 bridges along Highway 1 from 8 p.m. to 7 a.m.
  • The locations are:
    • Highway 68 at the Fairground Rd. Overcrossing in Monterey
    • North and southbound Highway 1 at Munras Ave. in Monterey
    • North and southbound Highway 1 at Casa Verde way in Monterey
    • Southbound Highway 1  onramp  at the Fremont St. in Monterey
    • Southbound Highway 1 at the Lake Drive Overcrossing in Marina
    • Southbound Highway 1 at the Lapis Spur overcrossing between Marina and Castroville
    • Southbound Highway 1 at the Pajaro River bridge near Watsonville
    • Southbound Highway 1 at the Beach Road undercrossing near Watsonville
    • Southbound and Northbound Highway 1 at Struve Slough near Watsonville
    • Southbound Highway 1 at the Larkin Valley Road undercrossing near Aptos
  • Motorists can expect delays of approximately 10 minutes.
Highway 68 – Monterey:  Sewer Repair Project from Mar. 10 – Apr. 18
  • Daytime shoulder work on westbound Highway 68 from Highway 218 (Canyon Del Rey Boulevard) to the Calvary Chapel driveway will close the westbound shoulder between the hours of 8:30 a.m. and 3:30 p.m.
  • Intermittent night work will also close a westbound lane between the hours of 8:30 p.m. and 5:00 a.m.
  • Single lane traffic controls will be in effect during these night hours.
  • Motorists can expect delays of approximately 10 minutes.
Highway 101 – San Lucas and King City: Apr. 14 – Apr. 17
  • Daytime sweeping at two locations from 8 a.m to 3 p.m.
  • Locations are:
    • Lockwood/San Lucas Rd at San Lucas
    • Broadway to Jolon Road at King City
  • Motorists can expect delays of approximately 10 minutes.
Highway 101 – Prunedale Improvement Project: Apr. 16 – Apr. 17
  • Nighttime bridge work will close the northbound San Miguel Canyon on and off ramps from 8:30 p.m. and 5:30 a.m. on Wednesday, April 16.
    • Northbound drivers should detour to the Highway 156 interchange.
  • Nighttime drainage work will result in alternating lane closures on northbound and southbound Highway 101 between Mallory Canyon Road Crazy Horse Canyon Road from 7:30 p.m. and 6 a.m. on Thursday, April 17.
  • Motorists can expect delays of approximately 10 minutes.
Highway 101 – San Juan Road Interchange: Apr. 14 – Apr. 18
  • Daytime paving will temporarily close:
    • San Juan Road between Highway 101 and Dunbarton Road
    • The northbound Highway 101 left turn lane to Cole Road
  • The closures will occur from 7 a.m. to 4:30 p.m. beginning Wednesday, April 16 and continue on Thursday, April 17 if needed.
  • Motorists should detour to San Miguel Canyon Road or Cannon Road.
  • Night work on Highway 101 will cause alternating lane closures on northbound and southbound Highway 101 between Dunbarton Road and Rocks / Cannon Road from 7:30 p.m. and 6 a.m.
  • Motorists can expect delays of approximately 10 minutes.
Highway 156 – Castroville: Apr. 15 – Apr. 16
  • Daytime pavement work on westbound Highway 156 between the Giel Street Pedestrian Crossing and Simon Park from 9 a.m. and 3 p.m.
  • Motorists can expect brief delays.

No comments:

Post a Comment