Highway 1 – Multiple Locations: Apr. 14 – Apr. 18
- Daytime drainage, crack and seal, and maintenance work at two locations along Highway 1 between from 7 a.m. to 3:30 p.m.
- Locations are:
- Rain Rock to Lime Creek Bridge: Crack Seal Operation
- Big Creek Bridge: Maintenance Operation
- Lime Creek Bridge to Garrapata Creek Bridge: Drainage work and vegetation spraying.
- Motorists can expect delays of approximately 10 minutes.
Highway 1 – Carmel:
Apr. 13 – Apr. 14
- Nighttime pavement work on southbound Highway 1 between Third Avenue and Ocean Avenue from 8 p.m. to 5 a.m.
- Motorists can expect delays of approximately 10 minutes.
Highway 1 and 68 – Monterey to
Aptos: Apr. 14 – Apr. 18
- Night time striping work on 10 bridges along Highway 1 from 8 p.m. to 7 a.m.
- The locations are:
- Highway 68 at the Fairground Rd. Overcrossing in Monterey
- North and southbound Highway 1 at Munras Ave. in Monterey
- North and southbound Highway 1 at Casa Verde way in Monterey
- Southbound Highway 1 onramp at the Fremont St. in Monterey
- Southbound Highway 1 at the Lake Drive Overcrossing in Marina
- Southbound Highway 1 at the Lapis Spur overcrossing between Marina and Castroville
- Southbound Highway 1 at the Pajaro River bridge near Watsonville
- Southbound Highway 1 at the Beach Road undercrossing near Watsonville
- Southbound and Northbound Highway 1 at Struve Slough near Watsonville
- Southbound Highway 1 at the Larkin Valley Road undercrossing near Aptos
- Motorists can expect delays of approximately 10 minutes.
Highway 68 – Monterey:
Sewer Repair Project from Mar. 10 – Apr. 18
- Daytime shoulder work on westbound Highway 68 from Highway 218 (Canyon Del Rey Boulevard) to the Calvary Chapel driveway will close the westbound shoulder between the hours of 8:30 a.m. and 3:30 p.m.
- Intermittent night work will also close a westbound lane between the hours of 8:30 p.m. and 5:00 a.m.
- Single lane traffic controls will be in effect during these night hours.
- Motorists can expect delays of approximately 10 minutes.
Highway 101 – San Lucas and King
City: Apr. 14 – Apr. 17
- Daytime sweeping at two locations from 8 a.m to 3 p.m.
- Locations are:
- Lockwood/San Lucas Rd at San Lucas
- Broadway to Jolon Road at King City
- Motorists can expect delays of approximately 10 minutes.
Highway 101 – Prunedale Improvement Project: Apr. 16 – Apr.
17
- Nighttime bridge work will close the northbound San Miguel Canyon on and off ramps from 8:30 p.m. and 5:30 a.m. on Wednesday, April 16.
- Northbound drivers should detour to the Highway 156 interchange.
- Nighttime drainage work will result in alternating lane closures on northbound and southbound Highway 101 between Mallory Canyon Road Crazy Horse Canyon Road from 7:30 p.m. and 6 a.m. on Thursday, April 17.
- Motorists can expect delays of approximately 10 minutes.
Highway 101 – San Juan Road
Interchange: Apr. 14 – Apr. 18
- Daytime paving will temporarily close:
- San Juan Road between Highway 101 and Dunbarton Road
- The northbound Highway 101 left turn lane to Cole Road
- The closures will occur from 7 a.m. to 4:30 p.m. beginning Wednesday, April 16 and continue on Thursday, April 17 if needed.
- Motorists should detour to San Miguel Canyon Road or Cannon Road.
- Night work on Highway 101 will cause alternating lane closures on northbound and southbound Highway 101 between Dunbarton Road and Rocks / Cannon Road from 7:30 p.m. and 6 a.m.
- Motorists can expect delays of approximately 10 minutes.
Highway 156 – Castroville: Apr. 15 – Apr. 16
- Daytime pavement work on westbound Highway 156 between the Giel Street Pedestrian Crossing and Simon Park from 9 a.m. and 3 p.m.
- Motorists can expect brief delays.
No comments:
Post a Comment