PIP Map

Friday, February 28, 2014

ROAD AND LANE CLOSURES FOR MAR 2 - MAR 9


Here are the major scheduled road and lane closures for Monterey County from Sunday, March 2, through Sunday, March 9, 2014 – newest information is in red. Please keep in mind that construction work is weather-dependent.

Highway 1 – Multiple Locations:  Mar. 3 – Mar. 7
  • Daytime drainage and pavement at multiple locations along Highway 1 between from 8 a.m. to 3:30 p.m.
  • Locations are:
    • Lime Creek Bridge to Garrapata Creek Bridge: Drainage work.
    • Hurricane Point to Garrapata Ridge Road: Crack and Seal work.
    • Rocky Creek Viaduct to Bixby Creek Bridge: Graffity Removal.
    • Rocky Creek Viaduct to Palo Colorado: Crack and Seal work.
  • Motorists can expect delays of approximately 10 minutes.
Highway 1 – Tree Removal at Multiple Locations:  Mar. 3 – Mar. 7
  • Four tree removal projects along southbound Highway 1 will take place Monday, March 3 through Friday, March 7 in the following locations:
  1. Southbound Hwy. 1, Mesa Drive/South Carmel Hill Drive near Carmel on:
·         Monday, March 3 and Tuesday, March 4 from 9 am to 3 pm.
·         Southbound traffic will be re-directed to northbound lane with delineation
·         Up to 30 minute delays are anticipated.

  1. Southbound Hwy. 1, Flanders Drive near Carmel on:
·         Wednesday, March 5 from 9 am to 3 pm.
·         Southbound traffic will be delineated to turn-pocket to get crane through
·         Up to 20 minute delays are anticipated.

  1. Southbound Hwy. 1,  Munras Off-ramp in Monterey on:
·         Thursday, March 6 from 9 am to 3 pm.
·         Southbound off-ramp will be closed at above location
·         Up to 5 minute delays are anticipated.

  1. Southbound Hwy. 1, Fern Canyon on:
·         Friday, March 7 from 9 am to 3 pm.
·         Southbound closure with one way traffic control on northbound lanes with flagging
·         Up to 10 minute delays are anticipated.

NOTE: There will be Electronic Message Boards alerting motorists and the CHP will assist with traffic control.

***SPECIAL NOTE: BIG SUR, CARMEL, CARMEL VALLEY AND CARMEL HIGHLANDS RESIDENTS TRAVELLING THIS AREA ARE STRONGLY ADVISED TO USE LAURELES GRADE.***

Highway 101 – Gonzales and Soledad:  Mar. 3 – Mar. 7
  • Daytime survey, median barrier, and striping work on Highway 101 from La Gloria Road to Arroyo Seco Road will result in alternating lane closures—northbound and southbound—between 4 a.m. and 4 p.m.
  • Motorists can expect delays of approximately 10 minutes.
Highway 101 – Prunedale Improvement Project: Mar. 3 – Mar. 7
  • Nighttime work will result in alternating lane closures on northbound and southbound Highway 101 between Vierra Canyon Road and Tustin Road from 7:30 p.m. and 6 a.m.
  • Motorists can expect delays of approximately 10 minutes.
Highway 101 – San Juan Road Interchange: Mar. 3 – Mar. 7
  • Night work on Highway 101 will cause alternating lane closures on northbound and southbound Highway 101 between Dunbarton Road and Rocks / Cannon Road from 7:30 p.m. and 6 a.m.
  • Motorists can expect delays of approximately 10 minutes.

No comments:

Post a Comment