PIP Map

Friday, February 13, 2015

ROAD AND LANE CLOSURES FEBRUARY 15 - FEBRUARY 22



Here are the major scheduled road and lane closures for Monterey County from Sunday, February 15 through Sunday, February 22, 2015 – newest information is in red. Please keep in mind that construction work is weather-dependent.

Highway 1 – Big Sur: February 17 – February 20
  • Daytime work along Highway 1 at two locations from 8 a.m. to 3 p.m.
  • The locations are:
    • Fullers Point to the Ventana Entrance for drainage work.
    • Sycamore Canyon Road to Hurricane Point for drainage work.
  • Motorists can expect delays of approximately 10 minutes
Highway 1 – North Marina: February 17 – February 20
  • Daytime paving along southbound Highway 1 between Del Monte Blvd/Neponset and the Lapis Spur overcrossing from 9 a.m. to 3 p.m.
  • Motorists can expect delays of approximately 15 minutes
Highway 68 – Pacific Grove to Salinas: February 17 – February 18
  • Daytime spraying along eastbound and westbound Highway 68 between Bishop Avenue and Foster Road from 9 a.m. to 3 p.m.
  • Motorists can expect delays of approximately 10 minutes
Highway 68 – Toro Park: February 16 – February 21
  • Night time utility work along eastbound and westbound Highway 68 between Toro Park and Bit Road from 8 p.m. to 5 a.m.
  • Motorists can expect delays of approximately 15 minutes
Highway 101 – Greenfield to Soledad: February 16 – 20
  • Daytime and night time median barrier and ramp work along Highway 101 between Espinosa Road and Arroyo Seco Road.
  • Motorists should expect delays of approximately 10 minutes.
Highway 101 – Salinas to Chualar: February 16 – 20
  • Daytime and night time shoulder work along southbound Highway 101 between Potter Road and Esperanza Road.
  • Motorists can expect delays of approximately 5 minutes
Highway 101 – Salinas to Prunedale: February 19 – 20
  • Daytime spraying along Highway 101 between Airport Boulevard and Highway 156 from 9 a.m. and 3 p.m.
  • Motorists should expect delays of approximately 5 minutes.
Highway 101 – Prunedale Improvement Project: February 17 – February 20
  • Night work will result in alternating lane closures on northbound and southbound Highway 101 at the following locations from 7:30 p.m. and 6 a.m.
  • The locations are:
    • Between Boronda Road and Ralph Lane.
    • Between Vierra Canyon Road and Tustin Road.
    • Between Mallory Canyon Road and Echo Valley Road.
  • Motorists should expect delays of approximately 10 minutes.
Highway 101 – San Juan Road Interchange Project: February 18 – 19
  • Night time k-rail removal along northbound Highway 101 between Dunbarton Road (South) and Cannon Road/Rocks Road from 8:30 p.m. and 5:30 a.m.
  • Motorists should expect delays of approximately 5 minutes.
Abbott Street Water Line Replacement Project
  • Waterline installation along the Abbott Street/Harkins Road/Dayton Street corridor may result in lane closures and traffic control.
  • Motorists can expect delays of approximately 5 minutes

No comments:

Post a Comment