Here
are the major scheduled road and
lane closures for Monterey County from Sunday,
March 2, through Sunday, March 9, 2014 – newest information is in red. Please keep in mind that construction work is
weather-dependent.
Highway 1 – Multiple Locations: Mar. 3 – Mar. 7
- Daytime drainage and pavement at
multiple locations along Highway 1 between from 8 a.m. to 3:30 p.m.
- Locations are:
- Lime Creek Bridge to Garrapata
Creek Bridge: Drainage work.
- Hurricane Point to
Garrapata Ridge Road: Crack and Seal work.
- Rocky Creek Viaduct to Bixby
Creek Bridge: Graffity Removal.
- Rocky Creek Viaduct to Palo
Colorado: Crack and Seal work.
- Motorists can expect delays of approximately 10 minutes.
Highway 1 – Tree Removal at Multiple Locations: Mar. 3 – Mar. 7
- Four tree removal projects along southbound Highway 1 will take place Monday, March 3 through Friday, March 7 in the following locations:
- Southbound Hwy. 1, Mesa Drive/South Carmel Hill Drive near Carmel on:
·
Monday, March 3 and Tuesday, March 4 from 9 am to 3 pm.
·
Southbound traffic will be re-directed to northbound lane with
delineation
·
Up to 30 minute delays are
anticipated.
- Southbound Hwy. 1, Flanders Drive near Carmel on:
·
Wednesday, March 5 from 9 am to 3 pm.
·
Southbound traffic will be delineated to turn-pocket to get crane
through
·
Up to 20 minute delays are
anticipated.
- Southbound Hwy. 1, Munras Off-ramp in Monterey on:
·
Thursday, March 6 from 9 am to 3 pm.
·
Southbound off-ramp will be closed at above location
·
Up to 5 minute delays are
anticipated.
- Southbound Hwy. 1, Fern Canyon on:
·
Friday, March 7 from 9 am to 3 pm.
·
Southbound closure with one way traffic control on northbound lanes
with flagging
·
Up to 10 minute delays are
anticipated.
NOTE: There will be Electronic
Message Boards alerting motorists and the CHP will assist with traffic control.
***SPECIAL NOTE:
BIG SUR, CARMEL, CARMEL VALLEY AND CARMEL HIGHLANDS RESIDENTS TRAVELLING THIS
AREA ARE STRONGLY ADVISED TO USE LAURELES GRADE.***
Highway 101 – Gonzales and Soledad: Mar. 3 – Mar. 7
- Daytime survey, median barrier,
and striping work on Highway 101 from La Gloria Road to Arroyo Seco Road will result in alternating lane
closures—northbound and southbound—between 4 a.m. and 4 p.m.
- Motorists can expect delays of approximately 10 minutes.
Highway 101 – Prunedale Improvement Project: Mar. 3 –
Mar. 7
- Nighttime work will result in
alternating lane closures on northbound and southbound Highway 101 between
Vierra Canyon Road and Tustin Road from 7:30 p.m. and 6 a.m.
- Motorists can expect delays of approximately 10 minutes.
Highway 101 – San Juan Road Interchange: Mar.
3 – Mar. 7
- Night
work on Highway 101 will cause alternating lane closures on northbound and
southbound Highway 101 between Dunbarton
Road and Rocks / Cannon Road from 7:30 p.m.
and 6 a.m.
- Motorists can expect delays of approximately 10 minutes.