PIP Map

Friday, November 13, 2015

ROAD AND LANE CLOSURES FOR NOVEMBER 15 – NOVEMBER 21

Here are the major scheduled road and lane closures for Monterey County from Sunday, November 15 through Saturday, November 21, 2015 – newest information is in red. Please keep in mind that construction work is weather-dependent.

Highway 1 – Gorda to Ragged Point
  • A major retaining wall construction project will result in one-way signalized traffic control, 24/7 between Gorda and Ragged Point.
  • All local businesses along the coast will remain open during the roadwork. 
  • Motorists should expect daytime delays of approximately 10 minutes.
Highway 1 – Lucia
  • A ½-mile project to construct a viaduct will result in one-way signalized traffic control, 24/7, 18 miles south of Big Sur near Lucia from south of Big Creek Bridge to south of Dolan Creek Bridge.
  • All local businesses along the coast will remain open during the roadwork. 
  • Motorists should expect daytime delays of approximately 15 minutes.
Highway 1 – Bridge Repair Work: November 16 – November 20
  • Bridge repair work on Highway 1 at multiple locations between Willow Creek Bridge and Castro Canyon Bridge from 7 a.m. to 4 p.m.
Highway 1 – Big Sur: November 16 – November 20
  • Daytime drainage clearing along Highway 1 between Point Sur and Garrapata Creek Bridge from 8:30 a.m. to 3 p.m.
Highway 1 / Highway 68 Interchange – Monterey: November 15 – November 20
  • Night time K-Rail installation will result in the closure of the southbound Highway 1 ramp to Highway 68 and the westbound Highway 68 ramp to Highway 1 between 9 p.m. and 6 a.m.
PG&E Gas Line Replacement Project – Highway 68
  • Gas line replacement work will result in night time lane closures along eastbound and westbound Highway 68 between Olmstead Road and Josselyn Canyon Road from 8 p.m. to 5 a.m.
Highway 101 – King City: November 16 – November 20
  • Daytime tree removal along the southbound lane of Highway 101 between Central Avenue and Hobson Avenue from 6 a.m. to 3 p.m. One lane will be closed for the tree removal.
  • Motorists should expect daytime delays of approximately 10 minutes.  
Highway 101 – Greenfield to Salinas: November 15 – November 20
  • Daytime and night time bridge work along Highway 101 from San Ardo to Alisal Street in Salinas.
Highway 198 – November 16 – November 20
  • Daytime slide removal along Highway 198 between Pine Valley Road and the Fresno County line from 8 a.m. to 3 p.m.
Salinas: Hitchcock Road Traffic Signal Project

  • A project to install traffic signals and realign a portion of Highway 68 at Hitchcock Road continues.
  • The #2 (right) lane of westbound Hwy. 68 will be closed at this location Monday through Thursday from 8 am until 6 pm and from 8 am until 4 pm on Fridays.
  • There will be a two-day overnight closure of Hitchcock Road Monday. Nov. 2 and Tuesday, Nov. 3 from 6 pm until 7 am
  • Hitchcock Road will remain open at Davis Road with access maintained for local residents.
  • Motorists can expect delays not too exceed ten minutes.

No comments:

Post a Comment