PIP Map

Friday, December 18, 2015

ROAD AND LANE CLOSURES FOR DECEMBER 20 – DECEMBER 26

Here are the major scheduled road and lane closures for Monterey County from Sunday, December 20 through Saturday, December 26, 2015 – newest information is in red. Please keep in mind that construction work is weather-dependent.

Highway 1 – Gorda to Ragged Point
  • A major retaining wall construction project will result in one-way signalized traffic control, 24/7 between Gorda and Ragged Point.
  • All local businesses along the coast will remain open during the roadwork. 
  • Motorists should expect daytime delays of approximately 10 minutes.
Highway 1 – Lucia
  • A ½-mile project to construct a viaduct will result in one-way signalized traffic control, 24/7, 18 miles south of Big Sur near Lucia from south of Big Creek Bridge to south of Dolan Creek Bridge.
  • Up to ten minute holds may be in effect to ensure the safe delivery of materials.
  • All local businesses along the coast will remain open during the roadwork. 
  • Motorists should expect daytime delays of approximately 15 minutes.
Highway 1 – Big Sur: December 21 – December 23
  • Bridge work on Highway 1 at Mill Creek Bridge and Castro Canyon Bridge from 9 a.m. to 5 p.m.
Highway 1 – Big Sur: December 21 – December 23
  • Guardrail work at two locations along Highway 1 from 8:30 a.m. to 3 p.m.
  • The locations are:
    • Hot Springs Creek Bridge to Fullers Point
    • Point Sur Naval Station to Little Sur River Bridge
Highway 1 – Carmel Highlands: December 21 – December 23
  • Bridge work along Highway 1 at Mal Paso Creek Bridge from 5 a.m. to 3 p.m.
Highway 1 – Monterey to Marina: December 20 – December 23
  • Night time grinding along Highway 1 between Sloat Avenue and Lake Drive from 8 p.m. to 7 a.m.
PG&E Gas Line Replacement Project – Highway 68
  • Gas line replacement work will result in night time lane closures along eastbound and westbound Highway 68 between Olmstead Road and Josselyn Canyon Road from 8 p.m. to 5 a.m.
PG&E Casing Removal Project – East Blanco Road
·         Removal of casing in the eastbound lanes of East Blanco Road between South Main Street and Abbott Street.
·         One lane will be closed during construction from November 30 – December 23.
·         Work hours are 8 a.m. to 4:30 p.m. 

Salinas: Hitchcock Road Traffic Signal Project
  • A project to install traffic signals and realign a portion of Highway 68 at Hitchcock Road continues.
  • The #2 (right) lane of westbound Hwy. 68 will be closed at this location Monday through Thursday from 8 am until 6 pm and from 8 am until 4 pm on Fridays.
  • Hitchcock Road will remain open at Davis Road with access maintained for local residents.
  • Motorists can expect delays not too exceed ten minutes.

Friday, December 11, 2015

ROAD AND LANE CLOSURES FOR DECEMBER 13 – DECEMBER 19

Here are the major scheduled road and lane closures for Monterey County from Sunday, December 13 through Saturday, December 19, 2015 – newest information is in red. Please keep in mind that construction work is weather-dependent.

Highway 1 – Gorda to Ragged Point
  • A major retaining wall construction project will result in one-way signalized traffic control, 24/7 between Gorda and Ragged Point.
  • All local businesses along the coast will remain open during the roadwork. 
  • Motorists should expect daytime delays of approximately 10 minutes.
Highway 1 – Lucia
  • A ½-mile project to construct a viaduct will result in one-way signalized traffic control, 24/7, 18 miles south of Big Sur near Lucia from south of Big Creek Bridge to south of Dolan Creek Bridge.
  • Up to ten minute holds may be in effect to ensure the safe delivery of materials.
  • All local businesses along the coast will remain open during the roadwork. 
  • Motorists should expect daytime delays of approximately 15 minutes.
Highway 1 – Big Sur: December 14 – December 18
  • Bridge work on Highway 1 at Mill Creek Bridge and Castro Canyon Bridge from 9 a.m. to 5 p.m.

Highway 1 – Big Sur: December 14 – December 18
  • Drainage clearing at two locations along Highway 1 from 8:30 a.m. to 3 p.m.
  • The locations are:
    • Lime Creek Bridge to Fullers Point
    • Point Sur Naval Station to Garrapata Creek Bridge
Highway 1 – Carmel Highlands: December 15 – December 16
  • Daytime paving along Highway 1 at Aurora Del Mar from 9 a.m. to 1 p.m.
  • There will be one-way traffic control.
Highway 101 – Soledad: December 14 – December 18
  • Daytime grinding along southbound Highway 101 between Route 146 and Arroyo Seco Road from 9 a.m. to 3 p.m.
PG&E Gas Line Replacement Project – Highway 68
  • Gas line replacement work will result in night time lane closures along eastbound and westbound Highway 68 between Olmstead Road and Josselyn Canyon Road from 8 p.m. to 5 a.m.
PG&E Casing Removal Project – East Blanco Road
·         Removal of casing in the eastbound lanes of East Blanco Road between South Main Street and Abbott Street.
·         One lane will be closed during construction from November 30 – December 23.
·         Work hours are 8 a.m. to 4:30 p.m. 

Salinas: Hitchcock Road Traffic Signal Project

  • A project to install traffic signals and realign a portion of Highway 68 at Hitchcock Road continues.
  • The #2 (right) lane of westbound Hwy. 68 will be closed at this location Monday through Thursday from 8 am until 6 pm and from 8 am until 4 pm on Fridays.
  • Hitchcock Road will remain open at Davis Road with access maintained for local residents.
  • Motorists can expect delays not too exceed ten minutes.

Friday, December 4, 2015

ROAD AND LANE CLOSURES FOR DECEMBER 6 – DECEMBER 12

Here are the major scheduled road and lane closures for Monterey County from Sunday, December 6 through Saturday, December 12, 2015 – newest information is in red. Please keep in mind that construction work is weather-dependent.


Highway 1 – Gorda to Ragged Point
  • A major retaining wall construction project will result in one-way signalized traffic control, 24/7 between Gorda and Ragged Point.
  • All local businesses along the coast will remain open during the roadwork. 
  • Motorists should expect daytime delays of approximately 10 minutes.
Highway 1 – Lucia
  • A ½-mile project to construct a viaduct will result in one-way signalized traffic control, 24/7, 18 miles south of Big Sur near Lucia from south of Big Creek Bridge to south of Dolan Creek Bridge.
  • Up to ten minute holds may be in effect to ensure the safe delivery of materials.
  • All local businesses along the coast will remain open during the roadwork. 
  • Motorists should expect daytime delays of approximately 15 minutes.
Highway 1 – Big Sur: December 7 – December 11
  • Bridge work on Highway 1 at Mill Creek Bridge and Castro Canyon Bridge from 9 a.m. to 5 p.m.

Highway 1 – Big Sur: December 7 – December 9
  • Emergency work on Highway 1 just south of Dolan Creek Bridge from 7:30 a.m. to 4:30 p.m.
Highway 1 – Big Sur: December 7 – December 11
  • Drainage clearing at two locations along Highway 1 from 8:30 a.m. to 3 p.m.
  • The locations are:
    • Lime Creek Bridge to Fullers Point
    • Molera Park Entrance to Garrapata Creek Bridge

Highway 1 – Point Lobos to Monterey: December 7 – December 9
  • Tree removal along Highway 1 at multiple locations from 9 a.m. to 2 p.m.
  • The locations are:
    • Point Lobos
    • Lower Walden Road
    • Northbound Highway 1 at Casa Verde Way

Highway 1 – Monterey to Marina: December 6 – December 11
  • Night time grinding along northbound and southbound Highway 1 between Sloat Avenue and the Lake Drive overcrossing from 8 p.m. to 7 a.m.
Highway 1 – Monterey: December 6 – December 11
  • K-Rail installation at multiple locations along Highway 1 from 7 p.m. to 7 a.m.
  • The locations are:
    • The Del Monte Boulevard ramps
    • The Fremont Street ramps
Highway 68 – Pacific Grove: December 10 – December 11
  • Daytime grinding and paving along westbound Highway 68 at the intersection of Forest Avenue and David Street from 7 a.m. to 3:30 p.m.

Highway 198 – December 7 – December 11
  • Daytime slide removal along Highway 198 between Pine Valley Road and the Fresno County line from 8 a.m. to 3:30 p.m.

PG&E Gas Line Replacement Project – Highway 68
  • Gas line replacement work will result in night time lane closures along eastbound and westbound Highway 68 between Olmstead Road and Josselyn Canyon Road from 8 p.m. to 5 a.m.

PG&E Casing Removal Project – East Blanco Road
·         Removal of casing in the eastbound lanes of East Blanco Road between South Main Street and Abbott Street.
·         One lane will be closed during construction from November 30 – December 23.
·         Work hours are 8 a.m. to 4:30 p.m. 

Salinas: Hitchcock Road Traffic Signal Project

  • A project to install traffic signals and realign a portion of Highway 68 at Hitchcock Road continues.
  • The #2 (right) lane of westbound Hwy. 68 will be closed at this location Monday through Thursday from 8 am until 6 pm and from 8 am until 4 pm on Fridays.
  • Hitchcock Road will remain open at Davis Road with access maintained for local residents.
  • Motorists can expect delays not too exceed ten minutes.

Wednesday, November 25, 2015

ROAD AND LANE CLOSURES FOR NOVEMBER 29 – DECEMBER 5

Here are the major scheduled road and lane closures for Monterey County from Sunday, November 29 through Saturday, December 5, 2015 – newest information is in red. Please keep in mind that construction work is weather-dependent.


Highway 1 – Gorda to Ragged Point
  • A major retaining wall construction project will result in one-way signalized traffic control, 24/7 between Gorda and Ragged Point.
  • All local businesses along the coast will remain open during the roadwork. 
  • Motorists should expect daytime delays of approximately 10 minutes.
Highway 1 – Lucia
  • A ½-mile project to construct a viaduct will result in one-way signalized traffic control, 24/7, 18 miles south of Big Sur near Lucia from south of Big Creek Bridge to south of Dolan Creek Bridge.
  • All local businesses along the coast will remain open during the roadwork. 
  • Motorists should expect daytime delays of approximately 15 minutes.
Highway 1 – Big Sur: November 30 – December 4
  • Bridge work on Highway 1 at Mill Creek Bridge and Castro Canyon Bridge from 7 a.m. to 4 p.m.
Highway 1 – Big Sur: November 30 – December 4
  • Drainage clearing at two locations along Highway 1 from 8:30 a.m. to 3 p.m.
  • The locations are:
    • Lime Creek Bridge to Fullers Point
    • Molera Park Entrance to Garrapata Creek Bridge
Highway 1 – Monterey: December 2
  • Bridge work along northbound Highway 1 at Iris Canyon Road from 9 a.m. to 1 p.m.
Highway 1 – Monterey: November 30 – December 4
  • K-Rail installation at multiple locations along Highway 1 from 7 p.m. to 7 a.m.
  • The locations are:
    • Between Sloat Avenue and Del Monte Boulevard
    • The northbound and southbound Casa Verde off-ramps
    • The northbound Fremont Street off-ramp
    • The Highway 68/Highway 1 interchange
Highway 198 – November 30 – December 4
  • Daytime slide removal along Highway 198 between Pine Valley Road and the Fresno County line from 8 a.m. to 3:30 p.m.
PG&E Gas Line Replacement Project – Highway 68
  • Gas line replacement work will result in night time lane closures along eastbound and westbound Highway 68 between Olmstead Road and Josselyn Canyon Road from 8 p.m. to 5 a.m.
PG&E Casing Removal Project – East Blanco Road
·         Removal of casing in the eastbound lanes of East Blanco Road between South Main Street and Abbott Street.
·         One lane will be closed during construction from November 30 – December 23.
·         Work hours are 8 a.m. to 4:30 p.m. 
·         November 30th – the eastbound lanes of East Blanco will be closed from 7pm to 9pm. 
·         Traffic will be detoured.  

Salinas: Hitchcock Road Traffic Signal Project

  • A project to install traffic signals and realign a portion of Highway 68 at Hitchcock Road continues.
  • The #2 (right) lane of westbound Hwy. 68 will be closed at this location Monday through Thursday from 8 am until 6 pm and from 8 am until 4 pm on Fridays.
  • Hitchcock Road will remain open at Davis Road with access maintained for local residents.
  • Motorists can expect delays not too exceed ten minutes.

Friday, November 20, 2015

ROAD AND LANE CLOSURES FOR NOVEMBER 22 – NOVEMBER 28

Here are the major scheduled road and lane closures for Monterey County from Sunday, November 22 through Saturday, November 28, 2015 – newest information is in red. Please keep in mind that construction work is weather-dependent.

Highway 1 – Gorda to Ragged Point
  • A major retaining wall construction project will result in one-way signalized traffic control, 24/7 between Gorda and Ragged Point.
  • All local businesses along the coast will remain open during the roadwork. 
  • Motorists should expect daytime delays of approximately 10 minutes.
Highway 1 – Lucia
  • A ½-mile project to construct a viaduct will result in one-way signalized traffic control, 24/7, 18 miles south of Big Sur near Lucia from south of Big Creek Bridge to south of Dolan Creek Bridge.
  • All local businesses along the coast will remain open during the roadwork. 
  • Motorists should expect daytime delays of approximately 15 minutes.
Highway 1 – Bridge Repair Work: November 23
  • Bridge repair work on Highway 1 at multiple locations at Mill Creek Bridge and Castro Canyon Bridge from 7 a.m. to 4 p.m.
PG&E Gas Line Replacement Project – Highway 68
  • Gas line replacement work will result in night time lane closures along eastbound and westbound Highway 68 between Olmstead Road and Josselyn Canyon Road from 8 p.m. to 5 a.m.
Highway 101 – San Ardo to Salinas: November 22 – November 24
  • Daytime and night time bridge work along Highway 101 from San Ardo to Alisal Street in Salinas.
Highway 101 – November 23 – November 24
  • Daytime survey work along northbound Highway 101 between Boronda road and Dunbarton Road from 9 a.m. to 2 p.m.
Salinas: Hitchcock Road Traffic Signal Project

  • A project to install traffic signals and realign a portion of Highway 68 at Hitchcock Road continues.
  • The #2 (right) lane of westbound Hwy. 68 will be closed at this location Monday through Thursday from 8 am until 6 pm and from 8 am until 4 pm on Fridays.
  • Hitchcock Road will remain open at Davis Road with access maintained for local residents.
  • Motorists can expect delays not too exceed ten minutes.

Friday, November 13, 2015

ROAD AND LANE CLOSURES FOR NOVEMBER 15 – NOVEMBER 21

Here are the major scheduled road and lane closures for Monterey County from Sunday, November 15 through Saturday, November 21, 2015 – newest information is in red. Please keep in mind that construction work is weather-dependent.

Highway 1 – Gorda to Ragged Point
  • A major retaining wall construction project will result in one-way signalized traffic control, 24/7 between Gorda and Ragged Point.
  • All local businesses along the coast will remain open during the roadwork. 
  • Motorists should expect daytime delays of approximately 10 minutes.
Highway 1 – Lucia
  • A ½-mile project to construct a viaduct will result in one-way signalized traffic control, 24/7, 18 miles south of Big Sur near Lucia from south of Big Creek Bridge to south of Dolan Creek Bridge.
  • All local businesses along the coast will remain open during the roadwork. 
  • Motorists should expect daytime delays of approximately 15 minutes.
Highway 1 – Bridge Repair Work: November 16 – November 20
  • Bridge repair work on Highway 1 at multiple locations between Willow Creek Bridge and Castro Canyon Bridge from 7 a.m. to 4 p.m.
Highway 1 – Big Sur: November 16 – November 20
  • Daytime drainage clearing along Highway 1 between Point Sur and Garrapata Creek Bridge from 8:30 a.m. to 3 p.m.
Highway 1 / Highway 68 Interchange – Monterey: November 15 – November 20
  • Night time K-Rail installation will result in the closure of the southbound Highway 1 ramp to Highway 68 and the westbound Highway 68 ramp to Highway 1 between 9 p.m. and 6 a.m.
PG&E Gas Line Replacement Project – Highway 68
  • Gas line replacement work will result in night time lane closures along eastbound and westbound Highway 68 between Olmstead Road and Josselyn Canyon Road from 8 p.m. to 5 a.m.
Highway 101 – King City: November 16 – November 20
  • Daytime tree removal along the southbound lane of Highway 101 between Central Avenue and Hobson Avenue from 6 a.m. to 3 p.m. One lane will be closed for the tree removal.
  • Motorists should expect daytime delays of approximately 10 minutes.  
Highway 101 – Greenfield to Salinas: November 15 – November 20
  • Daytime and night time bridge work along Highway 101 from San Ardo to Alisal Street in Salinas.
Highway 198 – November 16 – November 20
  • Daytime slide removal along Highway 198 between Pine Valley Road and the Fresno County line from 8 a.m. to 3 p.m.
Salinas: Hitchcock Road Traffic Signal Project

  • A project to install traffic signals and realign a portion of Highway 68 at Hitchcock Road continues.
  • The #2 (right) lane of westbound Hwy. 68 will be closed at this location Monday through Thursday from 8 am until 6 pm and from 8 am until 4 pm on Fridays.
  • There will be a two-day overnight closure of Hitchcock Road Monday. Nov. 2 and Tuesday, Nov. 3 from 6 pm until 7 am
  • Hitchcock Road will remain open at Davis Road with access maintained for local residents.
  • Motorists can expect delays not too exceed ten minutes.

Friday, November 6, 2015

ROAD AND LANE CLOSURES FOR NOVEMBER 8 – NOVEMBER 14

Here are the major scheduled road and lane closures for Monterey County from Sunday, November 8 through Saturday, November 14, 2015 – newest information is in red. Please keep in mind that construction work is weather-dependent.

Highway 1 – Gorda to Ragged Point
  • A major retaining wall construction project will result in daytime traffic control from 7 a.m. to 5 p.m. between Gorda and Ragged Point.
  • All local businesses along the coast will remain open during the roadwork. 
  • Motorists should expect daytime delays of approximately 10 minutes.
Highway 1 – South of Lucia
  • A ½-mile project to construct a viaduct will result in one-way signalized traffic control, 24/7, 18 miles south of Big Sur near Lucia from south of Big Creek Bridge to south of Dolan Creek Bridge.
  • All local businesses along the coast will remain open during the roadwork. 
  • Motorists should expect daytime delays of approximately 15 minutes.
Highway 1 – Bridge Repair Work: November 9 – November 13
  • Bridge repair work on Highway 1 at multiple locations between Willow Creek Bridge and Castro Canyon Bridge from 7 a.m. to 4 p.m.
Highway 1 – Big Sur: November 9 – November 13
  • Daytime drainage clearing along Highway 1 between Point Sur and Garrapata Creek Bridge from 8:30 a.m. to 3 p.m.
Highway 1 / Highway 68 Interchange – Monterey: November 11 – November 12
  • Night time K-Rail installation will result in the closure of the southbound Highway 1 ramp to Highway 68 and the westbound Highway 68 ramp to Highway 1 between 9 p.m. and 6 a.m.
PG&E Gas Line Replacement Project – Highway 68
  • Gas line replacement work will result in night time lane closures along eastbound and westbound Highway 68 between Olmstead Road and Josselyn Canyon Road from 8 p.m. to 5 a.m.
Highway 101 – King City: November 9 – November 13
  • Daytime tree removal along the southbound lane of Highway 101 between Central Avenue and Hobson Avenue from 6 a.m. to 3 p.m. One lane will be closed for the tree removal.
  • Motorists should expect daytime delays of approximately 10 minutes.  

Highway 101 – Greenfield to Salinas: November 8 – November 13
  • Daytime and night time bridge work along Highway 101 from San Ardo to Alisal Street in Salinas.

Highway 198 – November 9 – November 13
  • Daytime slide removal along Highway 198 between Pine Valley Road and the Fresno County line from 8 a.m. to 3 p.m.
Salinas: Hitchcock Road Traffic Signal Project

  • A project to install traffic signals and realign a portion of Highway 68 at Hitchcock Road continues.
  • The #2 (right) lane of westbound Hwy. 68 will be closed at this location Monday through Thursday from 8 am until 6 pm and from 8 am until 4 pm on Fridays.
  • There will be a two-day overnight closure of Hitchcock Road Monday. Nov. 2 and Tuesday, Nov. 3 from 6 pm until 7 am
  • Hitchcock Road will remain open at Davis Road with access maintained for local residents.
  • Motorists can expect delays not too exceed ten minutes.

Friday, October 30, 2015

ROAD AND LANE CLOSURES FOR NOVEMBER 1 – NOVEMBER 7

Here are the major scheduled road and lane closures for Monterey County from Sunday, November 1 through Saturday, November 7, 2015 – newest information is in red. Please keep in mind that construction work is weather-dependent.

Highway 1 – Gorda to Ragged Point
  • A major retaining wall construction project will result in daytime traffic control and full night time closures of Highway 1 between Gorda and Ragged Point from 10 p.m. to 7 a.m.
  • Night work will take place Sunday nights through Friday mornings.
  • Motorists traveling north/south of these closures are advised to reach their destinations before 10 p.m.
  • All local businesses along the coast will remain open during the roadwork. 
  • Motorists should expect daytime delays of approximately 10 minutes.
Highway 1 – South of Lucia
  • A ½-mile project to construct a viaduct will result in one-way signalized traffic control, 24/7, 18 miles south of Big Sur near Lucia from south of Big Creek Bridge to south of Dolan Creek Bridge.
  • All local businesses along the coast will remain open during the roadwork. 
  • Motorists should expect daytime delays of approximately 15 minutes.
Highway 1 – Bridge Repair Work: November 2 – November 6
  • Bridge repair work on Highway 1 at multiple locations between Willow Creek Bridge and Castro Canyon Bridge from 7 a.m. to 4 p.m.
Highway 1 – Big Sur: November 2 – November 6
  • Daytime drainage clearing along Highway 1 between Point Sur and Garrapata Creek Bridge from 8:30 a.m. to 3 p.m.
Highway 1 – Monterey: November 2 – November 5
  • Daytime tree removal at multiple locations along Highway 1 from 9 a.m. to 3 p.m.
  • The locations are:
    • Northbound Casa Verde Way on-ramp – Monday, November 2
    • Northbound Highway 1 at Mesa Drive – Tuesday, November 3
    • Southbound Highway 1 Munras Avenue off-ramp – Wednesday, November 4
    • Southbound Highway 1 at Fremont Street – Thursday, November 5
PG&E Gas Line Replacement Project – Highway 68
  • Gas line replacement work will result in night time lane closures along eastbound and westbound Highway 68 between Olmstead Road and Josselyn Canyon Road from 8 p.m. to 5 a.m.
Highway 101 – King City: November 2 – November 6
  • Daytime tree removal along the southbound lane of Highway 101 between Central Avenue and Hobson Avenue from 6 a.m. to 3 p.m. One lane will be closed for the tree removal.
  • Motorists should expect daytime delays of approximately 10 minutes.  
Highway 101 – San Ardo to Salinas: November 2 – November 6
  • Daytime and night time bridge work along Highway 101 from San Ardo to Alisal Street in Salinas.
Highway 101 – Prunedale: November 2 – November 6
  • Night time paving along southbound Highway 101 between Tustin Road and Blackie Road from 8 p.m. to 5 a.m.
  • Message Boards will be posted alerting motorists.
  • The CHP will be assisting with safety and traffic control.
  • Motorists can expect a delay not to exceed 15 minutes.
Highway 198 – November 2 – November 6
  • Daytime slide removal along Highway 198 between Pine Valley Road and the Fresno County line from 8 a.m. to 3 p.m.
Salinas: Hitchcock Road Traffic Signal Project
  • A project to install traffic signals and realign a portion of Highway 68 at Hitchcock Road continues.
  • The #2 (right) lane of westbound Hwy. 68 will be closed at this location Monday through Thursday from 8 am until 6 pm and from 8 am until 4 pm on Fridays.
  • There will be a two-day overnight closure of Hitchcock Road Monday. Nov. 2 and Tuesday, Nov. 3 from 6 pm until 7 am
  • Hitchcock Road will remain open at Davis Road with access maintained for local residents.
  • Motorists can expect delays not too exceed ten minutes.


Friday, October 23, 2015

ROAD AND LANE CLOSURES FOR OCTOBER 25 – OCTOBER 31

Here are the major scheduled road and lane closures for Monterey County from Sunday, October 25 through Saturday, October 31, 2015 – newest information is in red. Please keep in mind that construction work is weather-dependent.

Highway 1 – Gorda to Ragged Point
  • A major retaining wall construction project will result in daytime traffic control and full night time closures of Highway 1 between Gorda and Ragged Point from 10 p.m. to 7 a.m.
  • Night work will take place Sunday nights through Friday mornings.
  • Motorists traveling north/south of these closures are advised to reach their destinations before 10 p.m.
  • All local businesses along the coast will remain open during the roadwork. 
  • Motorists should expect daytime delays of approximately 10 minutes.
Highway 1 – South of Lucia
  • A ½-mile project to construct a viaduct will result in one-way signalized traffic control, 24/7, 18 miles south of Big Sur near Lucia from south of Big Creek Bridge to south of Dolan Creek Bridge.
  • All local businesses along the coast will remain open during the roadwork. 
  • Motorists should expect daytime delays of approximately 15 minutes.
Highway 1 – Bridge Repair Work: October 26 – October 30
  • Bridge repair work on Highway 1 at multiple locations between Willow Creek Bridge and Castro Canyon Bridge from 7 a.m. to 4 p.m. 
Highway 1 – Big Sur: October 26 – October 30
  • Daytime drainage clearing along Highway 1 between the Molera Park entrance and Garrapata Creek Bridge from 8:30 a.m. to 3 p.m.

Highway 1 – Big Sur: October 27 – October 30
  • Daytime slide clearing along Highway 1 between Kirk Creek Bridge and Vicente Creek Bridge from 8 a.m. to 3 p.m.
Highway 1 – Monterey: October 27
  • Daytime guardrail repair along northbound Highway 1 at Soledad Drive from 9 a.m. to 2 p.m.
PG&E Gas Line Replacement Project – Highway 68
  • Gas line replacement work will result in night time lane closures along eastbound and westbound Highway 68 between Olmstead Road and Josselyn Canyon Road from 8 p.m. to 5 a.m.
Highway 101 – King City: October 26 – October 30
  • Daytime tree removal along the southbound lane of Highway 101 between Central Avenue and Hobson Avenue from 6 a.m. to 3 p.m. One lane will be closed for the tree removal.
  • Motorists should expect daytime delays of approximately 10 minutes.  
Highway 101 – San Ardo to Salinas: October 26 – October 30
  • Daytime and night time bridge work along Highway 101 from San Ardo to Sanborn Street in Salinas.
Highway 101 – Prunedale: October 25 – October 30
  • Night time paving along southbound Highway 101 between Tustin Road and Blackie Road from 8 p.m. to 5 a.m.
  • Message Boards will be posted alerting motorists.
  • The CHP will be assisting with safety and traffic control.
  • Motorists can expect a delay not to exceed 15 minutes.
Salinas: Hitchcock Road Traffic Signal Project
  • A project to install traffic signals and realign a portion of Highway 68 at Hitchcock Road continues.
  • The #2 (right) lane of westbound Hwy. 68 will be closed at this location Monday through Thursday from 8 am until 6 pm and from 8 am until 4 pm on Fridays.
  • Motorists can expect delays not too exceed ten minutes.
Salinas: East Alisal Street/Skyway Boulevard Roundabout Project
  • The City of Salinas is constructing its first modern Roundabout at the East Alisal/Skyway intersection in Salinas.  Modern roundabouts generally provide the most efficient way of managing traffic through an intersection, while providing the benefits of fewer conflict points between pedestrians and motorists, which enhances pedestrian safety, reduces congestion and average vehicle delay, generating less pollution (via fewer vehicle stops and starts).
  • Current work consists of completing the irrigation and landscape improvements.
  • Motorists should expect 5-10 minute delays.