PIP Map

Friday, December 19, 2014

ROAD AND LANE CLOSURES FOR DECEMBER 21 - DECEMBER 28



Here are the major scheduled road and lane closures for Monterey County from Sunday, December 21 through Sunday, December 28, 2014 – newest information is in red. Please keep in mind that construction work is weather-dependent.


Highway 68 – December 21 – December 22
  • Night time utility work along eastbound and westbound Highway 68 at two locations from 8 p.m. to 5 a.m.
  • The locations are:
    • Between Route 218 (Cyn Del Rey) and Olmsted Road.
    • Between Toro Park and Bit Road
  • Motorists can expect delays of approximately 5 minutes
Highway 101 – Prunedale Improvement Project: December 21 – December 24
  • Night work will result in alternating lane closures on northbound and southbound Highway 101 at the following locations from 7:30 p.m. and 6 a.m.
  • The locations are:
    • Between Boronda Road and Ralph Lane.
    • Between Vierra Canyon Road and Tustin Road.
    • The northbound San Miguel Canyon Road off-ramp and on-ramp.
    • Between Mallory Canyon Road and Echo Valley Road.
    • The Crazy Horse Canyon Interchange northbound and southbound on-ramps and off-ramps. 
  • Motorists should expect delays of approximately 10 minutes.
Imjin Parkway Class II Bike Lane Project
  • Daytime bike lane work on Imjin Parkway between Reservation Road and Imjin Road may result in alternating lane closures from 9 a.m. to 4 p.m.
  • Motorists can expect delays of approximately 10 minutes
Abbott Street Water Line Replacement Project
  • The Don Chapin Company is installing a water line main along the Abbott/Harkins/Dayton corridor to improve water service to south Salinas California Water Service customers. During the Abbott Street portion of work that has commenced, the #1 southbound Abbott Street lane will be closed for the duration of next week. Abbott Street corridor and Abbott/Blanco/Sanborn intersection traffic should expect 10-minute delays during construction. Access to all businesses in the area will be available during the duration of construction, and bicycle lanes will remain available during construction.  Construction is not expected to occur on weekends, but traffic control will remain in place during those days for safety reasons. Construction is weather dependent.
  • Motorists can expect delays of approximately 10 minutes

Transportation Agency for Monterey County Winter Recess Schedule

The TAMC office will be closed during a Winter Recess scheduled from December 22nd- 26th. This recess includes our already designated holidays of December 24th and 25th (Christmas Eve and Day) as well as January 1st (New Year’s Day). The TAMC office will re-open for business on December 29th.

Please visit our website www.tamcmonterey.org


Happy Holidays & a Prosperous New Year
from all of us at TAMC

Friday, December 12, 2014

ROAD AND LANE CLOSURES FOR DECEMBER 14 - DECEMBER 21



Here are the major scheduled road and lane closures for Monterey County from Sunday, December 14 through Sunday, December 21, 2014 – newest information is in red. Please keep in mind that construction work is weather-dependent.


Highway 1 – Carmel Highlands: December 15 – December 19
  • Daytime utility work along Highway 1 between Peter Pan Road and Fern Canyon/Corona Road from 9 a.m. to 3 p.m.
  • Motorists can expect delays of approximately 10 minutes
Highway 68 – Pacific Grove: December 17
  • Daytime striping along Highway 68 between David Avenue and Scenic Drive from 9 a.m. to 12 p.m.
  • Motorists can expect delays of approximately 5 minutes
Highway 68 – December 15 – December 20
  • Night time utility work along eastbound and westbound Highway 68 at two locations from 8 p.m. to 5 a.m.
  • The locations are:
    • Between Route 218 (Cyn Del Rey) and Olmsted Road.
    • Between Toro Park and Bit Road
  • Motorists can expect delays of approximately 5 minutes
Highway 68 – Salinas: December 15 – December 19
  • Daytime utility work along Highway 68/ Main Street between John Street/Main Street and Monterey Street from 8:30 a.m. to 3 p.m.
  • Motorists can expect delays of approximately 5 minutes
Highway 101 – Greenfield: December 15 – December 19
  • Daytime and night time shoulderwork along northbound Highway 101 at multiple locations.
  • The locations are:
    • The northbound shoulder from Lagomarsino Avenue to just south of Hudson Road.
    • Oak Avenue on-ramp and off-ramp.
  • Motorists can expect delays of approximately 10 minutes
Highway 101 – Prunedale Improvement Project: December 14 – December 19
  • Night work will result in alternating lane closures on northbound and southbound Highway 101 at the following locations from 7:30 p.m. and 6 a.m.
  • The locations are:
    • Between Boronda Road and Ralph Lane.
    • Between Vierra Canyon Road and Tustin Road.
    • Between Mallory Canyon Road and Echo Valley Road.
    • The Crazy Horse Canyon Interchange northbound and southbound on-ramps and off-ramps. 
  • Motorists should expect delays of approximately 10 minutes.
Highway 101 – San Juan Road Project: December 15 – December 19
  • Night time work along northbound and southbound Highway 101 between Dunbarton Road and Cannon Road/Rocks Road from 7:30 p.m. to 6 a.m.
  • Motorists can expect delays of approximately 10 minutes
Highway 183 – Salinas: December 16 – December 17
  • Daytime pavement repair on Highway 183/Main Street between Route 68 Highway 101 and Bridge Street from 8:30 a.m. to 3 p.m.
  • Motorists can expect delays of approximately 5 minutes
Imjin Parkway Class II Bike Lane Project
  • Daytime bike lane work on Imjin Parkway between Reservation Road and Imjin Road may result in alternating lane closures from 9 a.m. to 4 p.m.
  • Motorists can expect delays of approximately 10 minutes
Abbott Street Water Line Replacement Project
  • The Don Chapin Company is installing a water line main along the Abbott/Harkins/Dayton corridor to improve water service to south Salinas California Water Service customers. During the Abbott Street portion of work that has commenced, the #1 southbound Abbott Street lane will be closed for the duration of next week. Abbott Street corridor and Abbott/Blanco/Sanborn intersection traffic should expect 10-minute delays during construction. Access to all businesses in the area will be available during the duration of construction, and bicycle lanes will remain available during construction.  Construction is not expected to occur on weekends, but traffic control will remain in place during those days for safety reasons. Construction is weather dependent.
  • Motorists can expect delays of approximately 5 minutes

Friday, December 5, 2014

ROAD AND LANE CLOSURES FOR DECEMBER 7 - DECEMBER 14



Here are the major scheduled road and lane closures for Monterey County from Sunday, December 7 through Sunday, December 14, 2014 – newest information is in red. Please keep in mind that construction work is weather-dependent.

Highway 1 – Big Sur: December 8 – December 12
  • Daytime grinding and paving along Highway 1 at Burns Creek Bridge from 7 a.m. to 5 p.m.
  • Motorists can expect delays of approximately 10 minutes
Highway 1 – Monterey: December 7 – December 12
  • Night time k-rail installation on the northbound Fremont Street Highway 1 on-ramp between from 8 p.m. to 6 a.m.
  • Motorists can expect delays of approximately 10 minutes
Highway 68 – Toro Park: December 7 – December 13
  • Night time utility work along eastbound and westbound Highway 68 at two locations from 8 p.m. to 5 a.m.
  • The locations are:
    • Between Route 218 (Cyn Del Rey) and Olmsted Road.
    • Between Toro Park and Bit Road
  • Motorists can expect delays of approximately 5 minutes
Highway 68 – Salinas River: December 10
  • Daytime utility work along eastbound and westbound Highway 68 at the Salinas River Bridge from 9 a.m. to 3 p.m.
  • Motorists can expect delays of approximately 10 minutes
Highway 68 – Salinas: December 9 – December 10
  • Daytime utility work along eastbound Highway 68/ Main Street between Pine Street and Oak Street/Geil Street from 9 a.m. to 2 p.m.
  • Motorists can expect delays of approximately 5 minutes
Highway 101 – Greenfield: December 7 – December 12
  • Daytime and night time k-rail installation along northbound Highway 101 at multiple locations \
  • The locations are:
    • The northbound shoulder from Lagomarsino Avenue to just south of Hudson Road.
    • Espinosa Road on-ramp and off-ramp.
    • Oak Avenue on-ramp and off-ramp.
    • Walnut Avenue on-ramp and off-ramp.
    • Thorne Road on-ramp and off-ramp.
  • Motorists can expect delays of approximately 10 minutes
Highway 101 – Gonzales: December 11
  • Daytime bridge work on the southbound Highway 101 off-ramp at Fifth Street/Johnson Canyon Road from 9 a.m. to 2 p.m.
  • Motorists can expect delays of approximately 10 minutes
Highway 101 – Salinas: December 9 – December 11
  • Daytime pavement repair on Highway 101 between Route 68 (John Street) and Route 183 (North Main Street) from 9 a.m. to 2 p.m.
  • Motorists can expect delays of approximately 10 minutes
Highway 101 – Prunedale Improvement Project: December 7 – December 12
  • Night work will result in alternating lane closures on northbound and southbound Highway 101 at the following locations from 7:30 p.m. and 6 a.m.
  • The locations are:
    • Between Boronda Road and Ralph Lane.
    • Between Vierra Canyon Road and Tustin Road.
    • The northbound San Miguel Canyon Road off-ramp and on-ramp.
    • Between Mallory Canyon Road and Echo Valley Road.
    • The Crazy Horse Canyon Interchange northbound and southbound on-ramps and off-ramps. 
  • Motorists should expect delays of approximately 10 minutes.
Highway 101 – San Juan Road Project: December 7 – December 12
  • Night time work along northbound and southbound Highway 101 between Dunbarton Road and Cannon Road/Rocks Road from 7:30 p.m. to 6 a.m.
  • Motorists can expect delays of approximately 10 minutes
Imjin Parkway Class II Bike Lane Project
  • Daytime bike lane work on Imjin Parkway between Reservation Road and Imjin Road may result in alternating lane closures from 9 a.m. to 4 p.m.
  • Motorists can expect delays of approximately 10 minutes
Abbott Street Water Line Replacement Project
  • The Don Chapin Company is installing a water line main along the Abbott/Harkins/Dayton corridor to improve water service to south Salinas California Water Service customers. During the Abbott Street portion of work that has commenced, the #1 southbound Abbott Street lane will be closed for the duration of next week. Abbott Street corridor and Abbott/Blanco/Sanborn intersection traffic should expect 10-minute delays during construction. Access to all businesses in the area will be available during the duration of construction, and bicycle lanes will remain available during construction.  Construction is not expected to occur on weekends, but traffic control will remain in place during those days for safety reasons. Construction is weather dependent.
  • Motorists can expect delays of approximately 5 minutes

Wednesday, November 26, 2014

ROAD AND LANE CLOSURES FOR NOVEMBER 23 - DECEMBER 7



Here are the major scheduled road and lane closures for Monterey County from Sunday, November 30 through Sunday, December 7, 2014 – newest information is in red. Please keep in mind that construction work is weather-dependent.

Highway 1 – Monterey: December 1 – December 5
  • Night time k-rail installation on the northbound Fremont Street Highway 1 on-ramp between from 8 p.m. to 6 a.m.
  • Motorists can expect delays of approximately 10 minutes
Highway 68 – Toro Park: December 1 – December 6
  • Night time utility work along eastbound and westbound Highway 68 between Toro Park and Bit Road from 8 p.m. to 5 a.m.
  • Motorists can expect delays of approximately 5 minutes
Highway 101 – Salinas: December 3 – December 5
  • Daytime pavement repair on Highway 101 between Route 68 (John Street) and Route 183 (North Main Street) from 9 a.m. to 2 p.m.
  • Motorists can expect delays of approximately 10 minutes
Highway 101 – Prunedale Improvement Project: December 1 – December 5
  • Night work will result in alternating lane closures on northbound and southbound Highway 101 at the following locations from 7:30 p.m. and 6 a.m.
  • The locations are:
    • Between Boronda Road and Ralph Lane.
    • Between Vierra Canyon Road and Tustin Road.
    • The northbound San Miguel Canyon Road off-ramp.
    • Between Mallory Canyon Road and Echo Valley Road.
    • The Crazy Horse Canyon Interchange northbound and southbound on-ramps and off-ramps. 
  • Motorists should expect delays of approximately 10 minutes.
Highway 101 – San Juan Road Project: December 2 – December 5
  • Night time work along northbound and southbound Highway 101 between Dunbarton Road and Cannon Road/Rocks Road from 7:30 p.m. to 6 a.m.
  • Motorists can expect delays of approximately 10 minutes
Imjin Parkway Class II Bike Lane Project
  • Daytime bike lane work on Imjin Parkway between Reservation Road and Imjin Road may result in alternating lane closures from 9 a.m. to 4 p.m.
  • Motorists can expect delays of approximately 10 minutes
Abbott Street Water Line Replacement Project
  • Waterline replacement will result in traffic control and lane closures between Sanborn Road and Harkins Road.
  • Motorists can expect delays of approximately 5 minutes