Highway 1/Rocky Creek Viaduct Project: Sept. 23 – Sept 27.
- Daytime
roadwork on Highway 1 continues next week from 7 a.m. to 5 p.m. Monday, Sept.
23 through Friday, Sept. 27.
- There will be NO OVERNIGHT CLOSURES OR NIGHT ROADWORK next week, Sunday, Sept. 22 through Thursday, Sept. 26.
Highway 1 at Rocky Creek has
one-way signalized traffic control 24/7. Traffic will be stopped for 10 minutes
at a time during daytime and nighttime roadwork.
Highway 1 Big Sur to South Coast: Sept. 23 – 26
- Tree work on Highway 1 between Lime
Creek Bridge and Grange Road from 8:30 a.m. to 3:30 p.m.
- Motorists can expect delays of approximately 10 minutes.
Highway 68 Pacific Grove:
Sept. 23
- One-day road sweeping on
Highway 68 in Pacific Grove from 9 a.m. to 12 p.m.
- Motorists can expect delays of approximately 10 minutes.
Highway 101 – San Lucas:
Sept. 25 – 26
- Day time sweeping work on
Highway 101 between Lockwood/San Lucas Rd and Route 198 from 8 a.m. to 3:30
p.m.
- Motorists can expect delays of approximately 10 minutes.
Highway 101 – King City:
Sept. 22– 26
- Night time Slab Replacement on
Highway 101 in King City from 7 p.m. to 6 a.m.
- Day Time sweeping on Highway
101 in King City between Canal Street and Broadway from 8 a.m. to 3:30 p.m.
- Motorists can expect delays of approximately 10 minutes.
Highway 101 – Gonzales and Soledad: Sept. 22 – 27
- Daytime drainage and electrical
work on Highway 101 from La Gloria Road to Arroyo
Seco Road will result in alternating lane closures—northbound and southbound—between
4 a.m. and 4 p.m.
- Motorists can expect delays of approximately 10 minutes.
Highway 101 – Chualar: Sept. 24 – 27
- Daytime drainage work on
Highway 101 between Alta St/Old Stage Rd and Main St/Chular St from 9 a.m.
to 3 p.m.
- Motorists can expect delays of approximately 10 minutes.
Highway 101 – Salinas: Sept. 25
- Daytime bridge work on Highway
101 between Market Street and Sherwood Drive from 9 a.m. to 2 p.m.
- Motorists can expect delays of approximately 10 minutes.
Prunedale Improvement Project – Ralph Lane to Pesante Road: Sept. 23 – Sept. 24
- Nighttime work on Highway 101
from Ralph Lane to Pesante Road will close one lane each direction between
7:30 p.m. and 6 a.m.
- The closure is needed for crews
to conduct work on the median barrier.
- Motorists can expect delays of approximately 10 minutes.
Prunedale Improvement Project – Crazy Horse
Canyon Road: Sept. 23 – Sept. 24
- Nighttime work on Highway 101
at Crazy Horse Canyon Road will cause alternating lane closures in each
direction between 7:30 p.m. and 6 a.m.
- The closure is needed for crews
to conduct work on the median barrier.
- Motorists can expect delays of approximately 10
minutes.
No comments:
Post a Comment