Road and lane closures for June 28 - Aug. 4


MONTEREY COUNTY – Here are the major scheduled road and lane closures for Monterey County from Sunday, July 28, through Sunday, August 4, 2013 – newest information is in red. Please keep in mind that construction work is weather-dependent.

Highway 1/Rocky Creek Viaduct Project:  July 29 – Aug. 2
  • Daytime roadwork on Highway 1 continues next week from 7 a.m. to 5 p.m. Monday, July 29 through Friday, August 2.
  • There will be no FULL OVERNIGHT CLOSURE of Hwy. 1 next week.
  • There WILL be NIGHT ROADWORK starting Monday, July 29 through Thursday, August 1 (opening Friday at 7am).
Highway 1 at Rocky Creek has one-way signalized traffic control 24/7. Traffic will be stopped for 10 minutes at a time during daytime and nighttime roadwork.

Highway 101 Greenfield:  July 30
  • Daytime pavement repair on Highway 101 from Espinosa Road to Underwood Road 8 a.m. and 12 p.m.
  • Motorists can expect delays of approximately 10 minutes.
Highway 101 Gonzales and Soledad:  July 29 – Aug. 2
  • Daytime survey work on Highway 101 from La Gloria Road to Arroyo Seco Road will result in alternating lane closures—northbound and southbound—between 6 a.m. and 4 p.m.
  • Motorists can expect delays of approximately 10 minutes.
Prunedale Improvement Project – Ralph Lane to Pesante Road:  July 29 – Aug.  2
  • Nighttime work on Highway 101 from Ralph Lane to Pesante Road will close one lane each direction between 8 p.m. and 6 a.m.
  • The closure is needed for crews to conduct work on the median barrier.
  • Motorists can expect delays of approximately 10 minutes.
San Juan Road Interchange: Night Work July 29 – Aug. 2
·        Night work on Highway 101 from Dunbarton Road to Rocks Road will close one lane each direction between the hours of 8 p.m. and 6 a.m.
·        Motorists can expect delays of approximately 10 minutes.

Highway 146 – Pinnacles: July 29 – Aug. 2  
  • Daytime pavement work on Highway 146 from Ramus Road to the San Benito County line between the hours of 10 a.m. to 3 p.m. on Tuesday July 29, through Friday, Aug. 2.
  • Motorists can expect delays of approximately 5 minutes.
Highway 198 – San Lucas:  July 29 – Aug. 2 
  • Daytime pavement work on Highway 198 East of San Lucas from Freeman Flat Road to Pine Valley Road between the hours of 8 a.m. to 3 p.m.
  • Motorists can expect delays of approximately 10 minutes.
***UPCOMING CLOSURE:  Left Turn Lanes on Highway 101 at Messick Road & Tustin Road ***
·        Crews will restripe the left turn lanes across Highway 101 at Messick Road and at Tustin Road the night of Aug. 5, making left turns at these intersections illegal.
·        K-Rail will be installed along the center median of Highway 101 at Messick Road and at Tustin Road on the nights of August 6 - 8, closing the left turn lanes permanently.
·        The closure will increase safety by eliminating left turns across the busy Highway 101 in this area.
·        The closures will also allow construction work to begin on the permanent center median barrier.
·        Please see maps below for detour routes.
 

 
  
 

Friday, July 19, 2013

Road and lane closures for June 21 - July 28

MONTEREY COUNTY – Here are the major scheduled road and lane closures for Monterey County from Sunday, July 21, through Sunday, July 28, 2013 – newest information is in red. Please keep in mind that construction work is weather-dependent.

Highway 1/Rocky Creek Viaduct Project:  July 22 – July 26
  • Daytime roadwork on Highway 1 continues next week from 7 a.m. to 5 p.m. Monday, July 22 through Friday, July 26.
  • There will be A FULL OVERNIGHT CLOSURE of Hwy. 1 on Wednesday, July 24 and Thursday, July 25 from 9 p.m. to 7 a.m.
  • No overnight closures will occur on Friday/Saturday nights. 
Highway 1 at Rocky Creek has one-way signalized traffic control 24/7. Traffic will be stopped for 10 minutes at a time during daytime and nighttime roadwork.

Highway 1 through Big Sur: July 22 – July 26
  • Day time drainage clearing and shoulder work the Big Sur coast between Buck Creek Bridge and Garrapata Creek Bridge from 8 a.m. to 3 p.m.
  • Motorists can expect delays of approximately 10 minutes.
Highway 101 Gonzales and Soledad:  July 22 – July 26
  • Daytime survey work on Highway 101 from La Gloria Road south will result in alternating lane closures—northbound and southbound—between 7 a.m. and 3:30 p.m.
  • Motorists can expect delays of approximately 10 minutes.
Prunedale Improvement Project – Ralph Lane to Pesante Road:  July 22 - 26
  • Nighttime work on Highway 101 from Ralph Lane to Pesante Road will close one lane each direction between 8 p.m. and 6 a.m.
  • The closure is needed for crews to conduct work on the median barrier.
  • Motorists can expect delays of approximately 10 minutes.
San Juan Road Interchange: Day and Night Work July 22 – July 26
·        Daytime work on Highway 101 from Dunbarton Road to Rocks Road will close one lane each direction between the hours of 10 a.m. and 2 p.m. on Wednesday, July 24, and Thursday, July 25.
·       Motorists can expect delays of approximately 10 minutes.
·       Night work continues this week with trucks hauling dirt across Highway 101 between San Juan Road to Cole Road.
·       Motorists can expect delays of approximately 5 minutes.

Highway 146 – Pinnacles: July 23 - 26  
  • Daytime pavement work on Highway 146 from Ramus Road to the San Benito County line between the hours of 9 a.m. to 1 p.m. on Tuesday July 23, through Friday, July 26.
  • Motorists can expect delays of approximately 10 minutes.
Highway 183 – Salinas: July 22 - 23  
  • Daytime shoulder work on Highway 183 from Stone Street to Lincoln Avenue in downtown Salinas between the hours of 8:30 a.m. to 3 p.m. on Monday July 22, and Tuesday, July 23.
  • Motorists can expect delays of approximately 5 minutes.
Highway 198 – San Lucas:  July 22 - 26 
  • Daytime pavement work on Highway 198 East of San Lucas from Peach Tree Valley Road to Griffin Road between the hours of 8 a.m. to 3 p.m.
  • Motorists can expect delays of approximately 10 minutes.
***UPCOMING CLOSURE:  Left Turn Lanes on Highway 101 at Messick Road & Tustin Road ***
·        Crews will install K-Rail along the center median of Highway 101 at Messick Road and at Tustin Road on August 4, closing the left turn lanes.
·       The closure will increase safety by eliminating left turns across the busy Highway 101 in this area. The closures will also allow construction work to begin on the permanent center median barrier.
·       Travelers should detour to San Miguel Canyon Road.

Friday, July 12, 2013

Road and lane closures for June 14 - July 31


MONTEREY COUNTY – Here are the major scheduled road and lane closures for Monterey County from Sunday, July 14, through Sunday, July 21, 2013 – newest information is in red. Please keep in mind that construction work is weather-dependent.

Highway 1/Rocky Creek Viaduct Project:  July 15 – July 19
  • Daytime roadwork on Highway 1 continues next week from 7 a.m. to 5 p.m. Monday, July 15 through Friday, July 19.
  • There will night work from 9 pm to 7 am, starting Monday, July 15 through Thursday, July 16 (Friday at 7am).
  • There will be NO OVERNIGHT FULL closures next week.
Highway 1 at Rocky Creek has one-way signalized traffic control 24/7. Traffic will be stopped for 10 minutes at a time during daytime and nighttime roadwork.

Highway 1 through Big Sur: July 15 – July 19
  • Day time work including vegetation spraying, tree trimming, drainage clearing, and paving along the Big Sur coast between Buck Creek Bridge and Hurricane Point from 7 a.m. to 4 p.m.
  • Motorists can expect delays of approximately 10 minutes.
Highway 1 Carmel: July 15 – July 19
  • Day time shoulder work between Camel River Bridge and Arroyo Del Mar from 9 a.m. to 2 p.m. Monday, July 15 through Friday, July 19.
  • Motorists can expect delays of approximately 5 minutes.
Highway 1 Carmel: July 17
  • Day time tree work between Ocean Avenue and Carpenter Street from 9 a.m. to 2 p.m. Wednesday, July 17.
  • Motorists can expect delays of approximately 10 minutes.
Highway 101 Gonzales and Soledad:  July 15 – July 19

  • Daytime survey work on Highway 101 from La Gloria Road south will result in alternating lane closures—northbound and southbound—between 7 a.m. and 3:30 p.m.
  • Motorists can expect delays of approximately 10 minutes.
Prunedale Improvement Project – Ralph Lane to Pesante Road:  July 15 - 19
  • Nighttime work on Highway 101 from Ralph Lane to Pesante Road will close one lane each direction between 8 p.m. and 6 a.m.
  • The closure is needed for crews to conduct work on the median barrier.
  • Motorists can expect delays of approximately 10 minutes.
Prunedale Improvement Project – San Miguel Canyon Overcrossing:  July 16 - 17  
  • Nighttime work on the San Miguel Canyon overcrossing will result in the closure of the north and south bound off ramps and on ramps from 7:30 p.m. to 6 a.m.
  • Travelers should detour to the 156 interchange.
  • Motorists can expect delays of approximately 10 minutes.
Prunedale Improvement Project – Echo Valley Road: July 15 - 19
·         CONSTRUCTION WILL CLOSE ACCESS BETWEEN US 101 AND ECHO VALLEY ROAD ON JULY 15.
·         Travelers should detour to San Miguel Canyon Road.
·         Additional road construction will occur on Echo Valley throughout the week. 
·         Motorists can expect delays of approximately 5 minutes.

Highway 198 – San Lucas:  July 15 - 19  
  • Daytime pavement work on Highway 198 in San Lucas from 8 a.m. to 2:30 p.m.
  • Motorists can expect delays of approximately 10 minutes.

Wednesday, July 10, 2013

REMINDER: CONSTRUCTION WILL PERMANENTLY CLOSE ACCESS BETWEEN US 101 AND ECHO VALLEY ROAD ON JULY 15

On Monday, July 15, Granite Construction and MCM Construction, Caltrans’ contractors for the US 101 Prunedale Improvement Project, will cul-de-sac Echo Valley Road at US 101, permanently eliminating direct access between US 101 and Echo Valley Road. This change was originally scheduled for July 8; the date was moved due to construction delays.


The good news is that this closure will allow construction work on the Crazy Horse Canyon Interchange to be completed as early as September; months ahead of schedule. In the meantime, though, it will mean out-of-direction travel for area residents and visitors, making getting to and from residences and businesses near the US 101/Echo Valley Road intersection more difficult.

  • To access US 101 from Echo Valley Road drivers will need to take Echo Valley Road to Tustin Rd., turn left on Tustin Rd., and then turn on to US 101.


  • To get from southbound US 101 to Echo Valley Road, drivers will need to exit at San Miguel Canyon Rd., turn right on San Miguel Canyon Rd., and follow it to Echo Valley Road.


  • To get from northbound US 101 to Echo Valley Road drivers will need to exit at San Miguel Canyon Rd., turn left on San Miguel Canyon Rd., and follow it to Echo Valley Road.


This accelerated construction is necessary to complete the new Crazy Horse Canyon Interchange before the rainy season begins. Closing off Echo Valley Road at this point will allow for faster construction of the new southbound US-101 off-ramp; once completed, the new Crazy Horse Canyon Interchange will eliminate left turns across US-101 in this area, provide easier access to and from Echo Valley Rd., and increase safety throughout the corridor.

More information about the Prunedale Improvement Project is available on the Transportation Agency for Monterey County’s website, www.tamcmonterey.org.


###

Friday, July 5, 2013

Road and lane closures for June 7 - July 14


Here are the major scheduled road and lane closures for Monterey County from Sunday, July 7, through Sunday, July 14, 2013 – newest information is in red. Please keep in mind that construction work is weather-dependent.

Highway 1/Rocky Creek Viaduct Project:  July 8  – July 12
  • Daytime roadwork on Highway 1 continues next week from 7 a.m. to 5 p.m. Monday, July 8 through Friday, July 12.
  • There will night work from 9 pm to 7 am, starting Monday, July 8 through Thursday, July 11 (Friday at 7am).
  • There will be NO OVERNIGHT FULL closures next week.
Highway 1 at Rocky Creek has one-way signalized traffic control 24/7. Traffic will be stopped for 10 minutes at a time during daytime roadwork.

Highway 1 through Big Sur: July 8 – July 1
  • Day time utility work along the Big Sur coast between Pfeiffer Burns State Park and Partington Ridge Road from 7 a.m. to 4 p.m.
  • Motorists can expect delays of approximately 5 minutes.
Highway 1 Seaside: July 8 – July 12
  • Night time bridge work at Sand Dunes Drive in Seaside from 8 p.m. to 6 a.m. Monday, July 8 through Friday, July 12.
  • Motorists can expect delays of approximately 10 minutes.
Highway 101 King City:  July 8 – July 12
  • Daytime road work will cause alternating lane closures in each direction of Hwy. 101 from 9 a.m. to 3 p.m. Monday, July 8 through Friday, July 12.
  • Roadwork will take place from:
    • Just south of the Jolon Undercrossing to the Jolon Undercrossing, including the Jolon Road southbound off ramp.
    • Just south of First St. Overcrossing to the First St. Overcrossing, including the First St. southbound onramp and northbound off-ramp.
    • The work is part of a two-month construction project to replace concrete slabs of a ¾ mile section of Highway 101 in King City.
  •  Motorists can expect delays of approximately 20 minutes.
Highway 101 Soledad:  July 8 – July 12
  • Work begins on widening the shoulder and constructing a concrete median barrier at two locations on Highway 101 in Soledad and just north of Soledad.
  • Roadwork will take place from:
    • Salinas River Bridge to Camphora Overcrossing
    • Just north of Soledad Prison Overcrossing to South Gonzales Overcrossing
  • The work will cause alternating lane closures in each direction of Hwy. 101 from midnight to 3:30 pm Mondays through Thursdays and from midnight am to 12:00 pm noon on Fridays.
  • Motorists can expect delays of approximately 10 minutes.
Highway 101 Gonzales:  July 8 – July 12
  • Daytime survey work on Highway 101 at La Gloria Road will result in alternating lane closures—northbound and southbound—between 7 a.m. and 3:30 p.m.
  • Motorists can expect delays of approximately 10 minutes.
Prunedale Improvement Project – Ralph Lane to Pesante Road:  July 8 - 12
  • Nighttime work on Highway 101 from Ralph Lane to Pesante Road will close one lane each direction between 8 p.m. and 6 a.m.
  • The closure is needed for crews to conduct work on the median barrier.
  • Motorists can expect delays of approximately 10 minutes.
Prunedale Improvement Project – San Miguel Canyon Overcrossing:  July 9
  • Daytime work on the San Miguel Canyon overcrossing will result in the closure of the north and south bound off ramps, and the north bound onramp from 8 a.m. to 5 p.m.
  • Motorists can expect delays of approximately 10 minutes.
San Juan Road: July 8- 10
·         San Juan Road will be closed to through traffic from just after the 76 Gas Station to Dunbarton Road from 7 a.m. to 6 p.m. on July 8 - July 10.
·         Crews will be doing drainage work and widening San Juan Road.
·         Travelers should detour to San Miguel Canyon Road.
·         Motorists can expect delays of approximately 5 minutes.

***UPCOMING CLOSURE:  Echo Valley Road at Highway 101***
·       CONSTRUCTION WILL CLOSE ACCESS BETWEEN US 101 AND ECHO VALLEY ROAD ON JULY 15.
·     This closure will allow construction work on the Crazy Horse Canyon Interchange to be completed as early as September; months ahead of schedule.
·      Travelers should detour to San Miguel Canyon Road.
·         Motorists can expect delays of approximately 5 minutes.

Wednesday, July 3, 2013

Announcement: Echo Valley Closure at Highway 101


CONSTRUCTION WILL CLOSE ACCESS BETWEEN US 101 AND ECHO VALLEY ROAD ON JULY 15
 

MONTEREY COUNTY –  On Monday, July 15, Granite Construction and MCM Construction, Caltrans’ contractors for the US 101 Prunedale Improvement Project, will cul-de-sac Echo Valley Road at US 101, permanently eliminating direct access between US 101 and Echo Valley Road. This change was originally scheduled for July 8; the date was moved due to construction delays.


The good news is that this closure will allow construction work on the Crazy Horse Canyon Interchange to be completed as early as September; months ahead of schedule. In the meantime, though, it will mean out-of-direction travel for area residents and visitors, making getting to and from residences and businesses near the US 101/Echo Valley Road intersection more difficult.

·       To access US 101 from Echo Valley Road drivers will need to take Echo Valley Road to Tustin Rd., turn left on Tustin Rd., and then turn on to US 101.

·       To get from southbound US 101 to Echo Valley Road, drivers will need to exit at San Miguel Canyon Rd., turn right on San Miguel Canyon Rd., and follow it to Echo Valley Road.
 
·         To get from northbound US 101 to Echo Valley Road drivers will need to exit at San Miguel Canyon Rd., turn left on San Miguel Canyon Rd., and follow it to Echo Valley Road.
 
This accelerated construction is necessary to complete the new Crazy Horse Canyon Interchange before the rainy season begins. Closing off Echo Valley Road at this point will allow for faster construction of the new southbound US-101 off-ramp; once completed, the new Crazy Horse Canyon Interchange will eliminate left turns across US-101 in this area, provide easier access to and from Echo Valley Rd., and increase safety throughout the corridor.

More information about the Prunedale Improvement Project is available on the Transportation Agency for Monterey County’s website, www.tamcmonterey.org.