Here
are the major scheduled road and
lane closures for the areas between Salinas and North Monterey County from Sunday, September 30, through Sunday,
October 7, 2012– newest information is in red. Please keep in mind that construction work is
weather-dependent.
Prunedale
Improvement Project: San Miguel Canyon Rd. and Hwy 101
· Construction work on San Miguel Canyon Rd., near Prunedale North
Rd. and the Prunedale Shopping Center, began on Monday, June 25. This work involves excavating the roadway to
install new traffic signals, curbs and sidewalks, and rebuild the roadway.
o
Motorists can expect delays
of about 15 minutes in the area.
o
Work will be done during the day.
o
Businesses are open, but access will change as work progresses.
Highway 68: July
30 – November 15
· Caltrans continues its work
grinding and paving a seven-mile section of Highway 68 from the Highway 1
interchange to SPCA Road.
o
Roadwork will be done during overnight hours and is expected to be
completed this fall.
o
Roadwork hours
are Mondays through Thursdays from 7 pm to 6 am; Fridays from 1 a.m. to 6 a.m.,
and Sundays from 10 p.m. to 6 a.m.
o
In areas where the roadway is four lanes, at least one lane will remain
open in each direction at all times.
o
Electronic message signs
will be posted.
o
Motorists can expect 15-20
minute delays.
o
For more information on this project and for traffic
updates on other
Caltrans projects in Monterey County, residents can call the District 5 toll free number at 1-877-448-6771 or can visit Caltrans' website at http://www.dot.ca.gov/dist05/paffairs/release.htm
Caltrans projects in Monterey County, residents can call the District 5 toll free number at 1-877-448-6771 or can visit Caltrans' website at http://www.dot.ca.gov/dist05/paffairs/release.htm
Highway
1 at Fremont St.: October 1 - 5
· Caltrans will be
working day and night on Highway 1 at Fremont St. Crews will be paving and
working on the bridge, Monday through Friday, October 1 - 5, between the hours
of 7 p.m. and 6 a.m., and 8 a.m. to noon.
o
This work will require lane closures.
o
Motorists should
expect delays of up to 10 minutes.
Traffic Advisories
from Monterey County Public Works
· Old Stage Road in Salinas
will have a lane closure from Herbert Road to Crazy Horse Canyon, between
September 14 and October 31.
o
PG&E is replacing a gas main.
o
Crews will be working
Mondays through Saturdays, from 7 a.m. to 7 p.m.
o
Traffic controls are in place.
o
Expect delays of up to 15 minutes.
· Iverson Road, between
Gloria Road and Johnson Canyon Road, will be closed to through traffic from
September 10 to September 26.
o
Crews will be installing a 12’ lateral pipe.
o
Work hours are 8 a.m. to 4
p.m., Monday through Friday.
o
Road is open to local residents, businesses, and emergency vehicles.
·
Scenic Rd. in Carmel, from
Carmel City Limits to Carmel State Beach on Carmelo Street, is now "One
Way" southbound only.
o
This change took place on September 5 and goes indefinitely.
**** Highway 1/Rocky Creek Viaduct
Project: Night Closures begin Oct. 11
· Full closures of Hwy. 1 at Rocky Creek will begin
on Thursday, October 11. The road will be closed from 9 p.m. to 7 a.m. through
the end of February 2013.
o
Roadwork will occur seven days a week, 24/7 with
one-way signalized traffic control.
o
Traffic will be stopped for 10 minutes at a time.
o
Full overnight closures will take place five
nights a week Sundays through Thursdays.
·
For more
information, please visit: http://www.dot.ca.gov/dist05/projects/
or contact the Hwy. 1 Cambria to Carmel Toll-Free Hotline at 888-836-0866.
No comments:
Post a Comment