PIP Map

Wednesday, May 25, 2011

ROAD AND LANE CLOSURES SCHEDULED FOR MAY 26 – JUNE 3

Here are the major scheduled road and lane closures for the areas between Salinas and North Monterey County between Thursday, May 26 and Friday, June 3:


Union Pacific Railroad Track Work in Salinas: May 23 - 2

  • Union Pacific Railroad will close the crossing at John St. in Salinas (between Spring St and Work St) to do some safety upgrades. This will be a full closure – Caltrans will provide signs to guide travelers through the suggested detour route.  With the Salinas Valleys' agricultural production in full swing, and that truck traffic is heavy in these areas, travelers are advised to please anticipate periods of congestion during these times. 


Union Pacific Railroad Track Work in Aromas: May 31 – June 1
  • Beginning Tuesday, May 31, at 8:00 a.m., Union Pacific Railroad (UP) will close San Juan Road just north of Aromas Road to repair the railroad crossing at that location.  According to UP, the repairs are needed as the crossing has been damaged by truck and rail traffic and the road must be closed to complete the work.  Railroad repairs will last until Wednesday, June 1, at 4:00 PM, weather permitting.

During this closure period, all traffic wishing to travel on San Juan Road will have to find alternate routes either via San Miguel Canyon Road or Highway 129.  Truck drivers and commuters should be prepared for delays and congestion on nearby Highway 101 not only because of increased traffic from the detour, but because of on-going Prunedale Improvement Project road construction.  Drivers should be alert and watch for detour signage.

An information Hot line with latest roadwork information has been created and can be accessed by calling (831) 755-5060.  Additional information can be obtained by accessing Department of Public Works’ web site at http://www.in.co.monterey.ca.us/publicworks/status.htm


Airport Blvd. Interchange Project: May 23 – May 26, and May 31 – June 
  • Bridge work for the Highway 101/Airport Blvd. Interchange Project will be result in a full closure of Hwy. 101 in both directions at Airport Blvd from 9 pm to 6 am for three nights from May 23 – May 26; these closures may also occur on May 31 and June 1.


o    Motorists headed northbound will be detoured at Abbott Street to Sanborn Road before reaching Hwy. 101.
o    Motorists headed southbound will be detoured at Sanborn Road to Abbott Street before reaching Hwy. 101. 


Prunedale Improvement Project: May 23 – June 3
  • PG&E will close one lane of Blackie Rd., from Hwy 101 to Prunedale South Rd., to relocate a gas main. This work will take place between the hours of 8 am and 5 pm, May 23 – June 3.

  •  PG&E will also be relocating a gas main on Echo Valley Rd.; this work will result in a temporary lane closure on Echo Valley Rd. May 23 – 27

  • PG&E work on Reese Circle, which will take place May 31 – June 9, will not result in any closures, but the lane will be limited to 10’.

  •  Caltrans will close the following, between the hours of 7:30 p.m. and 6 a.m., May 29 – June 3:

o    One Northbound lane, between Russell/Espinosa and Ralph Ln. 
o    One Southbound lane between Ralph Ln. and Russell/Espinosa 
o    One Northbound lane between San Miguel Canyon Rd and Tustin Rd. 
o    One Southbound lane between San Miguel Canyon Rd and Tustin Rd 
o    The Northbound San Miguel Canyon off-ramp  
           
            These closures are to allow crews to safely move concrete barriers and do pile driving.

  • California Water Services Company continues its work relocating a water main on Russell Rd. – this  this will result in temporary lane closures on Harrison Rd, Russell-Espinosa, Gianini Rd, and Easy St from May 19 – May 31.
    • Detour signs will be in place along Highway 101, Russell Rd., North Main St., and Harrison Rd. There will be flaggers to assist with traffic flow.   


Updates and information about construction for the Prunedale Improvement Project can be found on the Prunedale Improvement Project blog http://pipinfo.blogspot.com/ and on the PIP Facebook page http://www.facebook.com/pages/Prunedale-Improvement-Project/128188623918111.


Please drive safely and exercise caution in the construction zones.

(I will be out of the office May 26 - May 31.)




No comments:

Post a Comment